
非書媒體
編號(GPN/EBN):10110M0055
委辦計畫編號:MOEAWRA1080261
108-110年曾文水庫放淤監測與下游河道變遷影響分析(光碟版)
The Impact Analysis of the 2019 to 2021 Zengwen Reservoir Silt Disposal Operation Strategy on the Downstream Channel Morphology Transition
定價:定價1000
中文摘要
南水局刻正辦理「曾文水庫抽泥作業第三期」勞務採購案,為配合該作業及因應「曾文水庫防淤隧道工程」、「曾文水庫永久河道放水道」之水力排砂操作,將持續辦理水庫清淤及河道放淤工作,故仍需延續辦理水庫放淤監測及放淤後對下游河道水質、生態、河防安全、海岸之影響與評估,以掌握下游河道的影響變遷情形,爰成立本計畫。
英文摘要
To resolve the sedimentation problems caused by Typhoon Morakot of 2009, several desilting projects have been planning and executing for Zengwen Reservoir, including the desilting tunnel for hydraulic flushing. This project proceeded various investigation and analysis tasks for future operation of the flushing tunnel on its influences of returning sediment to the downstream channel transition. For this three-year project spanning from 2019 to 2021, research team will focus on several topics, including basic information collection, channel topographical survey, sediment sampling and test at estuary and channel, monitoring and analysis of estuary and channel transition, numerical simulation of sedimentation at estuary and channel, investigation, impact analysis, and evaluation of water quality and ecological monitoring, and proposing protection measures for potential influenced estuary and channel. Besides, result briefing meetings and documentation of project update reports are also the requirements for the project. The outcomes of these research topics are concluded in following sections.
- 作者 /逢甲大學
- 出版項 /台南市:南區水資源局 ,110.12
- 版本項 /初版
- 分類號 /443.6423
點選次數:129
HyRead電子書閱讀次數:250
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD006636 | 圖書室B1(中辦) | 202112 | 在館 | 水利署總館 |
loading.....