非書媒體
編號(GPN/EBN):1010402987
委辦計畫編號:MOEAWRA1040194
頭前溪河口段生態水利整體規劃及舊港島分流工效益評估研究(2/2)(光碟版)Study on overall planning of eco-hydraulics and benefit assessment of diversion dike in Touchien River's estuary(2/2)
定價:NT$1000
中文摘要
頭前溪河口段受到外海波浪、潮汐、匯流段交會之水理輸砂影響,歷年來變遷頗為顯著。水利署水利規劃試驗所、第二河川局等單位自民國94年起,陸續辦理河口段之治理規劃檢討、物模試驗、數模研究及工程執行規劃等計畫,目前河口段相關工程已完工約一年,其中舊港島分流工、苦苓腳凹岸丁壩及河口段疏濬等之效益,值得持續評估探討與研究。此外,為了提升河川生態環境之維護與保育概念,結合水文、地文、人文、生物、空間利用,以頭前溪河口段為例,整合相關水利工程措施,營造浮覆地與生態棲地環境,並結合公眾參與,研擬頭前溪河口段生態水利整體規劃,作為未來國內河口治理規劃之參考。本計畫分兩年執行,藉由動床數模工具、生態與人文調查、公眾參與等,進行頭前溪河口段生態水利整體規劃,除了評估河口段舊港島分流工、相關工程措施之效益外,配合座談、說明會等各類型公眾參與型式,結合生態與人文基本調查資料與相關水利模擬分析,綜合呈現整體規劃意涵與風貌,以供相關治理規劃與決策參考。
英文摘要
Influenced by the flow and sediment transport among wave, tide and river’s discharge, the morphology of Touchien River’s estuary has migrated dramatically in the past years. Several plans of Touchien River’s estuary had been proposed and executed by the Water Resources Planning Institute (WRPI), and the Second River Management Office since 2005, including the Review Improvement Planning, model experiments, mathematical tests, and engineering projects. The engineering projects of the estuary have been completed about two years ago. However, the estuary bed started to deposit. Hence, the benefit of building Jiugang Island diversion dikes, Kulingjiao concave bank dikes, and dredging the estuary should be assessed. In addition, aiming at restoring and conserving estuary’s ecological environment, both ecological environment and hydraulic engineering should be integrated in the overall planning of eco-hydraulic engineering of Touchien Estuary, which combines hydrology, geography, humanity, biology, and space utilization.
This study is carried out in two years. In this (second) year, work items include taking three ecological census of indicator species, simulating the long-term morphologic change of Touchien Estuary, assessing the effectiveness of the proposed countermeasure, proposing an overall planning of eco-hydraulics engineering, and recommending land-use management.
According to the sediment transport simulation result of several improvement engineering layouts of Jiugang Island diversion dike and other associated engineering works, an overall improvement engineering layout was recommended and assessed. On the overall improvement engineering layout with building a 32m in length, 2m in width, EL. 6m protection structure between Jiugang Island and diversion dike, shortening the length of no.1 Kulingjiao spur dike to 80m and dredging, it would decrease the water stage of the design discharge Q100 (8,530cms) on average about 0.5m in the Touchien Estuary, and enhance flood protection capability of Jiugang Island under Q20.
By integrating the analysis of 5S model, comments of citizen participation, and the benefit assessment of the overall improvement engineering layout, an overall planning of eco-hydraulics was recommended. Through dredging, bed material size of the estuary will change and this will be helpful for ecological restoration of indicator species. Furthermore, the advantages of the existence of indicator species include guiding water course, protecting bank, purifying water, and increasing bio-diversity.
- 作者 /國立交通大學
- 出版項 /新竹市:經濟部水利署第二河川局 ,104.12
- ISBN /9789860472660 ; 9789860472
- 版本項 /初版
- 分類號 /443.6
點選次數:173
PDF下載次數:10
HyRead電子書閱讀次數:1
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD004904 | 圖書室B1(中辦) | 201512 | 在館 | 水利署總館 | ||
FD005165 | 本所圖書室(本所B棟地下1樓圖書室) | 201512 | 在館 | 水利規劃分署 |
loading.....
我要預借
頭前溪河口段生態水利整體規劃及舊港島分流工效益評估研究(2/2)(光碟版)Study on overall planning of eco-hydraulics and benefit assessment of diversion dike in Touchien River's estuary(2/2)
AD004904
保留日期至2025-04-27
頭前溪河口段生態水利整體規劃及舊港島分流工效益評估研究(2/2)(光碟版)Study on overall planning of eco-hydraulics and benefit assessment of diversion dike in Touchien River's estuary(2/2)
FD005165
保留日期至2025-04-27
依河川
依水庫