
非書媒體
編號(GPN/EBN):10110H0018
委辦計畫編號:MOEAWRA1100388
急水溪(含支流白水溪)大斷面測量計畫成果報告書(光碟版)
The project of Measurement of Cross Section in Jishui River including Baishui River
定價:定價1000
中文摘要
為有效進行河川管理及河川治理規劃措施,本計畫針對急水溪流域辦理大斷面測量及建造物調查等工作,以因應近年氣候變遷所導致河道變化,進一步了解現況河道通洪能力與河防安全。本計畫河道縱橫斷面測量工作包含針對鄰近已知平面及高程控制點進行檢核,其中高程控制部分避免選擇地層下陷區之一等水準點。接續完成斷面樁清查、埋設與平面與高程坐標測量、河道縱橫斷面測量工作及河床質調查,並調查河道間防洪與跨渠建造物。最後依據本計畫測量與調查成果建立Hec-RAS水理模型,進行河道一維水理演算,作為防洪工程施設、河道通洪能力評估及河道疏濬作業等參考及依據。本計畫範圍為急水溪流域中包含主流急水溪,及5條支流含白水溪、仙草埔溪、龜重溪及鹿寮溪,總共完成17處已之平面控制點檢測、4處一等水準點檢測,並引測後計算完成702處斷面樁平面與高程坐標測量,接續完成351處河道斷面測量及完成急水溪跨渠與防洪建造物調查,並完成急水溪水系Hec-RAS一維水理模型建置。
英文摘要
In order to effectively carry out river management and river governance planning measures, this project will conduct large-section surveys and construction surveys for the rapids in the river basin, in order to respond to changes in the river course caused by climate changes in recent years, and to further understand the current flood capacity and river prevention of the river. Safety.The project includes checking the adjacent known planes and elevation control points, and the elevation control part avoids choosing one of the control points in the stratum subsidence area. Continue to complete the survey of cross-section piles, burying and measurement of plane and elevation coordinates, measurement of longitudinal and cross-section of river channels, and river bed quality survey, and investigation of flood control and cross-channel structures between rivers. Finally, based on the measurement and survey results of this project, a Hec-RAS hydrological model was established, and the one-dimensional hydrological calculation of the river was carried out, which was used as a reference and basis for the installation of flood control projects, the evaluation of the flood carrying capacity of the river, and the river dredging operation.The scope of this project covers the main stream and 5 tributaries including Baishui River, Xiancaopu River, Guizhong River and Luliao River in the Jishui River Basin. A total of 17 plane control points have been detected and 4 leveling point was detected, and after the introduction, the measurement of the plane and elevation coordinates of 702 cross-section piles was calculated, and the measurement of 351 river cross-sections was completed successively, and the survey of rapid water creek crossing channels and flood control structures was completed, and the rapid water stream system was completed Hec-RAS one-dimensional water model construction.
- 作者 /台灣整合防災工程技術顧問有限公司
- 出版項 /嘉義市:經濟部水利署第五河川局 ,110.12
- 版本項 /初版
- 分類號 /443.6897
點選次數:77
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
FD007635 | 本所圖書室(本所B棟地下1樓圖書室) | 202112 | 在館 | 水利規劃分署 | ||
QD000540 | 規劃課 | 202112 | 在館 | 第六河川分署 |
loading.....