
技術文件
編號(GPN/EBN):10108T0011
委辦計畫編號:MOEAWRA1070062
107年度集集攔河堰營運管理-資訊及儀控系統檢測維護委託服務工作成果總報告2018 SRI& Minformation & Instrument Control System of JiJi Weir Operations Management
定價:NT$600
中文摘要
集集攔河堰於91年正式營運,前已建置完成之資訊及儀控系統自92年起以「集集共同引水營運管理系統檢測維修管理」委託服務案方式,辦理水源調配管理、水門操作及資訊、儀控系統檢測維修等多項工作。歷經4年執行結果,除依據專業分工之不同工作屬性,並因水資源調配及水門操作為攔河堰管理之核心任務,故自96年起將原委託案分為「集集堰水資源調配及水門操作管理」及「集集堰資訊及儀控系統檢測維修」2案,採年度方式執行迄今。
英文摘要
The Jiji Water Diversion Project has been in operation since 91 years. It has built information and instrumentation system facilities, covering a wide range of information and instrumentation equipment. The overall operation of the river weir is under the supervision of this Council. It is mainly responsible for the detection of system equipment and maintenance work. Maintenance operations by the program host to supervise the work of the quality of the program, and the other to send a collaborative program host and contact resident at the scene, to assist the two sides to communicate with the coordination and rotation of manpower management and scheduling, and related engineering vendors or warranty manufacturers to deal with issues related issues The Resident information engineer two, which is responsible for the work of the mainframe management, user password maintenance management, web information, regular monitoring, water and discharge alarm system function check, equipment failure called repair, ancillary system inspection called repair, system implementation management, Spare parts management, virus software management. Maintenance of three external engineers, which is responsible for the work of the contents of a total of 12 major systems, such as regular maintenance operations and equipment abnormalities called repair, and abnormal events for the abnormal problems proposed equipment improvement recommendations to reduce the frequency of equipment failure.
In the first quarter of this year, the Jicai Management Center and the Changhua and Yunlin Control Centers are responsible for the security of the information and are responsible for the information security of the Government from time to time. The information security rules of the Government are strictly controlled and the infiltration of information safety management occur. The current system of the 12 major system in the year January to December of its exception handling of the inspection and maintenance events were a total of 129, after maintenance engineers for parts replacement and repair operations, has been completed, so that the system can be restored to normal operation.
During the maintenance of the maintenance period for the system maintenance and regular inspection inspection, the system for the occurrence of special events to discuss and propose related improvements, as the system after the revision of the reference. There were 5 special events in the current year and 5 completed.
In the past three years (January - December), the number of information systems for the past three years (January to December) was 187 for the year 104, 150for 105 years, 151 for 106 years,129 for 107 years, and for the past three years The number of unusual parts this year, a slight reduction in the trend, mainly on the third floor of the gate operating system is old, has been improved, thanks to the relevant contractors to assist with this, and actively cooperate with the technical staff involved in the case of the system for the lack of problems, The improvement of the operation, so that the current system is stable, one by one to reduce the system failure rate, to achieve the goal of facilities maintenance.
In the current year, from January to December, the Emergency Response Team was set up with a total of 139 hours in support of the manpower department, and the number of abnormal events during the response period was 1, and the technical staff were in the middle of the strait and after the release. Standby If there are abnormal conditions, will be as appropriate to carry out maintenance operations.
During the maintenance of the event by the occurrence of each unusual event, through the maintenance of manufacturers of professional and technical personnel, whenever the fault occurred after the immediate handling and problems to track, maintenance companies to assess the data for many years, for the major system (Such as over the years to make a significant improvement in the set of barrage weir gate operating system to improve the improvement of the runoff forecasting system to improve the CCTV monitoring system to improve the measures, the system lightning protection, the system of lightning protection, Measures to upgrade, the use of old equipment, the gradual replacement of old equipment, release alarm system to improve the improvement of equipment to improve virtualization to improve ... ... and so improve the plan), to promote the system to improve the stability and failure rate, according to the fault frequency to establish and improve the inventory The maintenance personnel in the shortest time to repair the equipment in order to allow the system to resume normal operation, and to maintain the Juba River weir operation and operation of the normal function of the hydrological system to provide effective information to facilitate the turbidity of the river Effective use of water.
The existing information-control system equipment and the improvement of the surrounding environment, through recent years, continue to improve the proposed matters, from the calendar year data can be seen its effectiveness in the operation of the weir stability, but also the system failure rate, the current system The improvement project should focus on the construction of the network structure and system integration management of the river weir operation. The bureau contracted to sign the consultant’s plan of "Enhancing the Planning, Design and Construction Supervision Commissioned Services of JIJI Weir Management System" for planning, and the team of the transport team will cooperate with the commissioned vendors to make recommendations on the system status and direction of improvement The system is more in line with the current situation, allowing the overall operation efficiency of the collection weir to achieve the expected results.
- 作者 /精誠科技整合股份有限公司
- 出版項 /台中市:經濟部水利署中區水資源局 ,108.02
- 版本項 /初版
- 分類號 /443.64151
點選次數:163
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AC013015 | 圖書室B1(中辦) | 201902 | 在館 | 水利署總館 | ||
TC007788 | 中水局經管課 | 201902 | 在館 | 中區水資源分署 | ||
TC007789 | 中水局經管課 | 201902 | 在館 | 中區水資源分署 |
loading.....
我要預借
107年度集集攔河堰營運管理-資訊及儀控系統檢測維護委託服務工作成果總報告2018 SRI& Minformation & Instrument Control System of JiJi Weir Operations Management
AC013015
保留日期至2025-04-28
107年度集集攔河堰營運管理-資訊及儀控系統檢測維護委託服務工作成果總報告2018 SRI& Minformation & Instrument Control System of JiJi Weir Operations Management
TC007788
保留日期至2025-04-28
107年度集集攔河堰營運管理-資訊及儀控系統檢測維護委託服務工作成果總報告2018 SRI& Minformation & Instrument Control System of JiJi Weir Operations Management
TC007789
保留日期至2025-04-28
依河川
依水庫