中文摘要
在鄰近大鵬灣潮口嘉蓮里至南平里海岸段,由105 至106 年第七河川局執行之「屏東海岸防護計畫規劃」報告分析結果,顯示海岸有侵蝕退縮情形,以及當地民眾多次陳情反映,該岸段在防護設施上相較其南北海岸顯有不足,可能造成潛在災害之發生。於前期相關計畫中已另提出上述岸段初步之工程防護構想,但於今(107)年1 月3 日海岸防護規劃審查會議中,審查委員建議該段防護工法應辦理數值模擬研究確認工法可行性,以提出最適合海岸防護方案。
英文摘要
According to the report of 2016-2017“Coastal Protection Project and Planning in Pingdong” dominated by the 7th River Management Office, WRA, the shoreline from Jia-Lian village, inlet of Dapeng Bay to Nan-Ping village represented erosion situation. The
local people there also responded that the shore protection in this area is insufficient than seawalls in the adjacent north and south coasts and may cause potential disasters. Early related projects had proposed the protection concepts for this area; however, the review committee (on January 3, 2018) suggested to estimate the suitable construction using numerical method. Therefore, this project is mainly to investigate the seawalls between the shoreline in the southern Dong-Gang to Nan-Ping village (about 4.5 kilometers of total length).
- 作者 /國立中山大學
- 出版項 /屏東市:經濟部水利署第七河川局 ,108.01
- 版本項 /初版\
- 分類號 /443.3
點選次數:125
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AC013202 | 圖書室B1(中辦) | 201901 | 在館 | 水利署總館 |
loading.....
我要預借
大鵬灣出水口南北兩側整體防護數模計畫Hydrodynamic simulation and the integrated protection plan for the coast atound tje outlet of Dapeng Bay
AC013202
保留日期至2025-04-27
依河川
依水庫