102年度七河局轄區洪水預警及防汛整合作業(光碟版) Flood early warning and flood control integration project under the jurisdiction of the Seventh River management office in 2013
定價:NT$1000
中文摘要
本局於民國100年度完成高屏溪洪水預報系統、101年度完成東港溪及四重溪洪水預報系統,可於颱風時期透過即時資料蒐集,模擬展示颱風降雨預報相關資訊。本計畫主要利用本局既有洪水預報系統或提出自行開發系統或其他開發權利可歸屬機關之既有系統辦理資料蒐集及洪水預報系統預警應用於防汛整合作業之相關評估。
英文摘要
The Seventh River Management Office of Water Resource Agency (WRA07) has established and completed DRAINS model in year 2012, including Gaoping River, Donggang River and Sizhong River. Following are the main function of DRAINS model: "The Typhoon Climatologic Quantitative Precipitation Forecast (TCQPF) mode" typhoon precipitation forecasting display, QPESUMS precipitation display, flood forecasting display, multi-weather plot, etc, providing flood forecasting information during typhoon and heavy rain seasons.
Base on the WRA07 DRAINS model, this year (2013) we proceed flood early warning and flood control integration project, including: 1. flood forecasting system data collection; 2. flood forecasting system accuracy enhancement; 3. flood forecasting area review; 4. evaluating the connection between flood forecasting system and flood disaster; 5. flood control information integration. Following are the results:
1. Flood forecasting system data collection
Collecting the latest river cross section data of Gaoping River, Donggang River and Sizhong River, then integrating with dredging data after confirming. Updating the geo-data, collecting the latest H-Q curve, and also updating the database of water level, rainfall and astronomical tide. According to "Regulation Master Plan of Gaopin River (First Revise)" report in year 2008, we use the latest cross section (2012) of Gaoping River with design flow to do simulation, to analyze the anti-flood ability of current cross section. For the new established water channel and water station in concerned, we do on-site survey to understand its situation and location of water station.
2. Flood forecasting system accuracy enhancement
In addition to this project will be the system to update the geography, but also the use of 2012, and this year’s typhoon Talim Soulik typhoon forecast system model parameters for test, to reduce the risk to the geography data or model parameters do not match with the current situation caused by the forecast error . In addition, this year also build system error analysis module, you can graphically show the correlation coefficient, average error, RMS, coefficient of efficiency, consistency index and other five kinds of error analysis indicators to forecast for the event correction assessment and analysis of events after the end of the review. By the number of events this year, typhoon forecasting results analysis, the system can correct responses during typhoon water level trends, but accuracy still river section changes and rainfall forecasting errors, it is recommended that follow-up data should be continuously updated physiographic and evaluate the rainfall forecast into multiple sources to improve the accuracy of forecasting systems.
3. Flood forecasting area review
For Gaoping river, according to the latest measurement section, increasing the main tributaries of the original forecast Gaoping build section, while the Zhuokou River and Kouai River into the forecast, this extends the range of outcomes, such as shown in table 1; For Donggang River, the main work is to add tributary and drainage to the system, including Wanan River, Niujiowan River,Linluo river drainage、Longjing river drainage and Jiaping river drainage. The results are as shown in table 2:
Table 1 The increased range of forecast in Gaoping River
Watershed Name River Name River No. Original forecast range Expand the scope of this year
Section range Section Year Section range Section Year
Gaoping
River Gaoping River 173000 000~074 99 000~074 101
Laonong River 173010 075~024 99 075~049 101
Zhuokou River 173011 - - 001~033 101
Ailiao River 173020 100~131 99 100~131 101
Qishan River 173030 001~099 99 001~152 101
Kouai River 173031 - - 001~040 101
Meinong River 173032 001~073 95 001~073 96
Table 2 The increased range of forecast in Gaoping River
Watershed Name River Name River No. Original forecast range Expand the scope of this year
Section range Section Year Section range Section Year
Donggang
River Donggang River 174000 000~023 100 000~074 100
Donggang River 174000 075~024 95 075~049 95
Niujiowan River 174010 - - 001~042 99
Wanan River 174020 - - 000~025 99
Linluo river drainage - - - 001~123 96
Longjing river drainage - - - 001~070 96
Jiaping river drainage - - - 001~047 96
For Sizhong River, because the cross sections of tributary Damei river and Zhushe river are not enough, it is difficult to build hydraulic model, and these two are not under governance of WRA07, therefore we continue to update parameters of Sizhong River DRAINS model and do flood forecasting.
4. Evaluating the connection between flood forecasting system and flood disaster
There are several warning functions built in DRAINS model, including topping warning, rising rate estimation module of observation water level, accumulated rainfall and flood warning. With the latest river bank elevation, each warning water level and rainfall data, we can provide warning information in advance. Through the four typhoon events this year, the flood warning function of WRA07 DRAINS model can really work, but the warning time of Donggang rain station is a little late than the flood occurred time, lowering down the warning rainfall is advised.
For the flood survey, the Flooding investigation plan execution has been done before flood season. According to the previous plan, flood survey project was done at Linbian Township、Jiadong Township、Neipu Township and Meinong Dist. during typhoon Kong-Rey, the flood survey results were collected and the report was completed as well.
5. Flood control information integration
With the help of WRA07, the application of local government realtime water level interfacing service of Water Resource Agency (WRA) is done, the realtime observation data of Pingtung county government can be provided every 10min; the realtime observation data of Kaohsiung city government has not been transmitted to WRA, if the realtime data can be transmitted in the future, the same platform and method will be used.
- 作者 /多采工程顧問有限公司
- 出版項 /屏東縣:經濟部水利署第七河川局 ,102.12
- 版本項 /初版
- 分類號 /443.6
點選次數:160
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD004159 | 圖書室B1(中辦) | 201312 | 在館 | 水利署總館 | ||
BD005183 | 圖書室B1(北辦) | 201312 | 在館 | 水利署總館 | ||
ID000731 | 圖書館 | 201312 | 在館 | 第七河川分署 | ||
ID000732 | 圖書館 | 201312 | 在館 | 第七河川分署 |
loading.....
我要預借
102年度七河局轄區洪水預警及防汛整合作業(光碟版) Flood early warning and flood control integration project under the jurisdiction of the Seventh River management office in 2013
AD004159
保留日期至2025-04-28
102年度七河局轄區洪水預警及防汛整合作業(光碟版) Flood early warning and flood control integration project under the jurisdiction of the Seventh River management office in 2013
BD005183
保留日期至2025-04-28
102年度七河局轄區洪水預警及防汛整合作業(光碟版) Flood early warning and flood control integration project under the jurisdiction of the Seventh River management office in 2013
ID000731
保留日期至2025-04-28
102年度七河局轄區洪水預警及防汛整合作業(光碟版) Flood early warning and flood control integration project under the jurisdiction of the Seventh River management office in 2013
ID000732
保留日期至2025-04-28
依河川
依水庫