
技術文件
編號(GPN/EBN):10111T0060
委辦計畫編號:MOEAWRA1110008
111年度石岡壩監測及安全檢查-淤積測量(光碟版)
Year 111 Shih-Gang Dam Monitor & Security Check Survey
定價:定價1000
中文摘要
為因應水源調配,石岡壩依往例每年均辦理淤積測量,以瞭解實際蓄容量及淤積量。
英文摘要
The Shigang Reservoir was completed in 1966. Its main function is to regulate and store the upstream Tachiachi Hydro Power Plant’s tail water to supply public water in Taichung. After the completion of the Liyutan Reservoir in 1982, it was used in conjunction with the reservoir to meet the growing water demand in Taichung.In response to the allocation of water sources, Shigang Reservoir has conducted siltation measurements every year to understand the actual storage capacity. Shigang Reservoir is located in the Tachiachi Basin. Due to the 921 earthquake, the dam body was uplifted, the slope of the upstream riverbed slowed, and its catchment area Geological loosening and typhoon heavy rains can easily carry a large amount of soil and rock downward. Although the sand is discharged by hydraulic power, some soil and rock are still stagnated in the Shigang Reservoir water storage area. The bureau will continue to handle the dam area dredging project after the 1994 year, in order to clearly understand the Shigang Reservoir The current siltation volume and storage capacity need to be verified and compared with continuous reservoir siltation measurement, and then an effective dredging plan can be put forward in order to achieve the goal of extending the life of the reservoir and sustainable use of water resources.According to the results of this year’s siltation measurement, the actual total capacity of the reservoir in this year calculated by the contour method is 1,484,087 cubic meters, which is an decrease of 127,822 cubic meters compared to the actual total capacity of 1,611,909 cubic meters in 2021; The actual effective capacity of 2022 calculated by the surface method is 1,417,324 cubic meters, which is an decrease of 188,043 cubic meters compared with the actual effective capacity of 1,605,367 cubic meters in 2021.In addition, the estimated dredging volume (S06-1~S16) for this year is 606,259 cubic meters based on the recommended plan in the evaluation report of the dredging section handled this year.
- 作者 /鉅識測繪科技有限公司
- 出版項 /台中市:中區水資源局 ,111.12
- 版本項 /初版
- 分類號 /443.6412
點選次數:74
HyRead電子書閱讀次數:0
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD006854 | 圖書室B1(中辦) | 202212 | 在館 | 水利署總館 | ||
TD000309 | 中水局經管課 | 在館 | 中區水資源分署 |
loading.....