轄管洪水預報系統擴充及維護,除採用最新水文地文資料進行系統更新並維護既有功能之外,將持續參數檢定驗證,並針對洪水預報時期所需功能進行擴充,以提升九河局洪水預報之作業成果與品質。
英文摘要
The 9th River Management Office (RMO-9) has started the Advance planning of flood forecast system establishment in 9th River Management Office jurisdiction areas project in 2012, and continued by Integration of flood warning and flood control operation in 9th River Management Office jurisdiction areas in 2013. Currently, the flood and inundation forecast system in Hualian River and Xiuguluan River are implemented, and are now able to provide in-time flood information and inundation analysis in typhoon events. 2014 has enhanced map-based display and data upgrade as well. Personnel dispatched has executed in 2015. The main objects of this year are:
1. System maintenance and data update: System is updated and maintained at least 2 times to ensure normally operation. Also Modules are calibrated and verified by using the observed data of typhoon MATMO and NEPARTAK, respectively. Furthermore, provide the full-time flood early warning system conception.
2. Map-based display expansion: The Map-based display system is updated the system using the latest data. Embankment, revetment, flood volunteers, disaster resistant community, flood installations are received and displayed on the system. Besides, the arbitrary feature upload function is developed this year.
3. Forecast information automatic uploading module maintenance: To ensure the forecast information automatic uploading to Water Resource Agency (WRA) function operated during flood period. In this year, there are 27 water information reports are provided toWRA.
4. Personnel dispatched and forecast information suggestion: 52water information reports are provided in totally 7 events this year. Personnel are dispatched into RMO-9 for 168 man-hours during torrential rain and typhoon period.
5. Reports delivery and training: The reports are delivered with regulation, and training courses are held
6. Flood survey: Accomplished the flood arrangement. Flood survey is launched in typhoon NEPARTAK and MEGI.
- 作者 /多采工程顧問有限公司
- 出版項 /花蓮市:經濟水利署第九河川局 ,105.12
- ISBN /9789860511062 ; 9789860511
- 版本項 /初版
- 分類號 /443.6
點選次數:155
PDF下載次數:5
HyRead電子書閱讀次數:2
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AC012586 | 圖書室B1(中辦) | 201612 | 在館 | 水利署總館 | ||
FC032417 | 本所圖書室(本所B棟地下1樓圖書室) | 201612 | 在館 | 水利規劃分署 |
loading.....
我要預借
105年度九河局轄區洪水預警及防汛整合作業Flood Early Warning and Flood Control Integration Project under the Jurisdiction of the Ninth River Management Office in 2016
AC012586
保留日期至2025-04-28
105年度九河局轄區洪水預警及防汛整合作業Flood Early Warning and Flood Control Integration Project under the Jurisdiction of the Ninth River Management Office in 2016
FC032417
保留日期至2025-04-28
依河川
依水庫