
非書媒體
編號(GPN/EBN):1010501166
委辦計畫編號:MOEAWRA1040160
後龍溪水資源環境觀測及調查計畫(2)-跨域加值整合與方案研究評估--光碟版=Environmental Survey for Water Resources in Houlong River(II) – Assessment of Cross-Field Value-Adding Integration
定價:NT$500
中文摘要
天花湖水庫工程計畫主要為供應苗栗地區之公共給水需求。政府為解決財政困窘,近來推出跨域加值計畫政策,以祈紓解籌措公共建設財源壓力,採取「跨域加值」概念推動公共建設,整合開發方式達到更高的效益成果,「跨域」概念不只跨部會合作,還可以跨縣市、跨產業合作,「加值」係指運用政策整體規劃,創造更高價值。
本研究之目的為就天花湖水庫與周邊產業及資源,作異業結合考量,並對其產生之效益、影響、財務、風險及推動方式等項目,進行有系統之評估。作為天花湖水庫將來進行推動跨域加值方案之參考,爰辦理本計畫研處。
英文摘要
I. Origion of the Project and Content of Work
Tien Hwa Hu Reservoir is an important water resource facility under planning of the government and is off-stream designed. It is located at Towu Township of Miaoli County. Area of the catchment is 693 hectares, and the area of flood zone is 222 hectares.
The recharge of Tien Hwa Hu Reservoir mainly from Dalukaeng River Barrage. Dalukaeng river barrage is 228 meters downstream of Dalukaeng hydrological station, and its’ designed intake flow is 22~25 cms, including 2~5 cms suppling to Chuanlong System. The residual water is delivered to the reservoir by diversion tunnel.
To effectively move the ongoing construction projects forward, financial re-distribution is deemed necessary, and the concept of Cross-field value-adding, which means more active financial integration and feasibility should be incorporated into the public works.
While water resources development plans are able to be combined with urban planning within the area, it will help developing the surrounding areas, build a better connection between construction and development, and maximize benefits of public works.
This project analyzes the feasibilities of environment, finance, risk among the facilites, such as Tien Hwa Hu Reservoir, diversion tunnel and Dalukaeng River Barrage, etc, peripheral industries and other related projects.
II. Basic Information and Analysis of Related Cases
A. Collection and Analysis of Policies Related to Water resources and Cross-field value-adding: For the purpose of implementing water resources plan, this project collects policies, which was posted by government administrations, related to water resources and cross-field value-adding.
B. Collection and Analysis of Policies and Case related to Cross-field value-adding at home and abroad: Water resources are expected to have a newer development according to domestic and foreign policies and case analysis. However, plans need to be drafted accoding to no impact of water supply.
C. Collection and Analysis of plans related to surroundings: In order to make a intergrated value-adding project of Tien Hwa Hu Reservoir across space and time, this project collects plans related to surroundings.
D. Investigation and Analysis of Basic Situation: To promote the contruction of the reservoir, this project will take some interviews with regional administrations for understaning residents’ demands and recommendations.
III. Draft of Cross-Field Value-Adding Project and Feasibility Aessessment
A. Relevance Analysis of Main Project with Cross-Field Value-Adding: This project plans yolk zone and protein zone respectively by investigating its neighboring development and taking interviews with residents.
B. Investigation of principal limiting factor and impact factor:
i. Principal Limiting Factor-Environmentally Sensitive Area, Residents’ Objection in addition to keep water quality and quantity, Cooperation of Government and Private Industries.
ii. Impact Factor-Policies, Environment, Programs.
C. Draft of Cross-Field Value-Adding Project: The cases in this project will be planned under conditions such as suitable terrain slope, local development, etc. The cases do not affect the purpose of construction of the reservoir and do not go against restriction of EIA.
D. Feasibility Analysis of Cross-Field Value-Adding Project: This project will follow the manual of cross-field value-adding in water resources planning, and to assess from 4 factors-the purpose of the water resources development, feasibility of regulations, feasibility of finance and feasibility of carried out. The procedure showned in Abstract Figure 1. Results of the analysis showned in Abstract Table 2.
IV. Assessment of Cross-Field Value-Adding Project
A. Feasibility Analysis of Finance Benefit and Risk Assessment:
i. Feasibility Analysis of Finance Benefit- Finance Benefits of this project result in low correlation to cross-field value-adding project according to result of self-liquidating ratio.
ii. Risk Assessment-Reclassify risks to four types: policies, foundation, ecological and program execution. Proposing orientation about decreasing possibilities of factors of risks after analysised it.
B. Raise of Financial Resources, dispatch of funds, fianancial balancing and responsibilities: This project provides two recommendations about amending laws and financial applications.
C. Feasibility Analysis in promoting Cross-Field Value-Adding Project: The Water Resources Planning Institute will make investigation, planning and cooperation of cross-field value-adding with administrations such as Taiwan Water Corporation, Taiwan Power Company, Taiwan Sugar Corporation and other private industries.
In summary, this project takes consideration of social, financial, environmental benefit and makes policies with cross-sector cooperation trough taking interviews with several local administrations. These projects will be anticipated to satisfy local requirements for the purpose of follow-up construction of Tien Hwa Hu Reservoir, developing water resources and creating ecological environment.
- 作者 /艾奕康工程顧問股份有限公司
- 出版項 /台中市:經濟部水利署水利規劃試驗所 ,105.08
- ISBN /9789860493764 ; 9789860493
- 版本項 /初版
- 分類號 /443.6
點選次數:118
PDF下載次數:6
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD005292 | 圖書室B1(中辦) | 201608 | 在館 | 水利署總館 | ||
FD005374 | 本所圖書室(本所B棟地下1樓圖書室) | 201608 | 在館 | 水利規劃分署 | ||
FD005375 | 本所圖書室(本所B棟地下1樓圖書室) | 201608 | 在館 | 水利規劃分署 | ||
FD005376 | 本所圖書室(本所B棟地下1樓圖書室) | 201608 | 在館 | 水利規劃分署 |
loading.....
我要預借
後龍溪水資源環境觀測及調查計畫(2)-跨域加值整合與方案研究評估--光碟版=Environmental Survey for Water Resources in Houlong River(II) – Assessment of Cross-Field Value-Adding Integration
AD005292
保留日期至2025-04-28
後龍溪水資源環境觀測及調查計畫(2)-跨域加值整合與方案研究評估--光碟版=Environmental Survey for Water Resources in Houlong River(II) – Assessment of Cross-Field Value-Adding Integration
FD005374
保留日期至2025-04-28
後龍溪水資源環境觀測及調查計畫(2)-跨域加值整合與方案研究評估--光碟版=Environmental Survey for Water Resources in Houlong River(II) – Assessment of Cross-Field Value-Adding Integration
FD005375
保留日期至2025-04-28
後龍溪水資源環境觀測及調查計畫(2)-跨域加值整合與方案研究評估--光碟版=Environmental Survey for Water Resources in Houlong River(II) – Assessment of Cross-Field Value-Adding Integration
FD005376
保留日期至2025-04-28
依河川
依水庫