牡丹水庫取水設施檢討及颱洪期取水改善設計The Improvement of Intake Facility and Water Intake Plan during the Typhoon Period of Mudan Reservoir
定價:NT$1000
中文摘要
牡丹水庫大壩為一中央心層分區滾壓土石壩,壩頂長445.6公尺,最大壩高約65公尺,壩頂高程EL.145M。溢洪道設於左岸,為明渠洩槽式,右側與大壩銜接,其進口為弧形閘門控制之溢流堰,下接洩槽,尾端設有戽斗及落水池。面對颱洪期間可能產生之原水高濁度問題,牡丹水庫於民國100年完成溢洪道戽斗取水設施工程可取用EL.127.5M之原水以及106年新增抽淤管線抽取表層水,於100年至今皆能有效降低高濁度之衝擊。依據107年12月24日「研商牡丹水庫壩頂永久分層取水」會議決議,基於供水穩定、水庫永續及排淤等功能兼顧下,仍請審慎加以評估於高濁度時考量施設相關因應措施。為確保屏東地區供水穩定,故辦理本次計畫,針對檢討現有高濁度因應措施、水源調度以及整合台水公司相關因應措施情況下,加以分析評估並提出整體評估報告。
英文摘要
Mudan Reservoir serves as the main water source for Mudan water supply system.
Water is withdrawn into the reservoir through the inclined intake structure. The
reservoir supplies around 80,000 tons of water per day to Mudan Water Treatment
Plant. Then, the treatment plant supplies around 75,000 tons of water per day to 17
townships in southern Pingtung. Therefore, the condition of water supply in the
reservoir has significant impacts on the livelihood of the residents in southern
Pingtung. The high turbidity of water during the typhoon period, however, affects the
normal intake condition of the intake structures. In dealing with the high turbidity
condition, several backup plans are proposed in this project.
1. Spillway bucket intake facility
The bottom elevation of the spillway gates is EL.127.5m. Based on the flow
simulation, the bucket can draw water stably under the optimal discharge flow
rate below 100cms. If the discharge flow rate is greater than 350cms, hydraulic
jumps occur and cause water to fall directly into the pool. Since 2011, the event
has happened for about 17 hours in total.
2. Mechanical dredging and intake facility
This facility was initially operated in 2017. The auxiliary facility can pump about
35,000 CMD of water during no dredging period, and resolve the water shortage
issues due to hydraulic jump. However, the water supply is still lack about 45,000
CMD.
This project is aimed to achieve stable water supply during the typhoon period. In
order to achieve the objective, some plans are proposed as following:
1. Constructing new surface-intake facility which receives 80,000 CMD.
2. Developing subsurface water system which receives 55,000 CMD.
3. Expanding or constructing new clear water basin which can store about 80,000
tons of water in advance.
4. Conjunctive use of groundwater during typhoon period.
Considering the economic efficiency and the maintenance cost of the facilities, the
construction of new clear water basin is prioritized. Then, it is followed by the
construction of new surface-intake facility and the development of subsurface water
system, respectively.
- 作者 /黎明工程顧問股份有限公司
- 出版項 /台南市:經濟部水利署南區水資源局 ,109.03
- 版本項 /初版
- 分類號 /443.6432
點選次數:136
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AC013632 | 圖書室B1(中辦) | 202003 | 在館 | 水利署總館 |
loading.....
我要預借
牡丹水庫取水設施檢討及颱洪期取水改善設計The Improvement of Intake Facility and Water Intake Plan during the Typhoon Period of Mudan Reservoir
AC013632
保留日期至2025-04-29
依河川
依水庫