
非書媒體
編號(GPN/EBN):10109T0010
委辦計畫編號:MOEAWRA1080020
108年度集集攔河堰營運管理-營管系統檢測維護委託服務工作成果總報告2019 Summary Report of Inspection and Maintenance of Management system of JiJi Weir Operation Management
定價:NT$1100
中文摘要
集集攔河堰於91年正式營運,前已建置完成之資訊及儀控系統自92年起以「集集共同引水營運管理系統檢測維修管理」委託服務案方式,辦理水源調配管理、水門操作及資訊、儀控系統檢測維修等多項工作。歷經4年執行結果,除依據專業分工之不同工作屬性,並因水資源調配及水門操作為攔河堰管理之核心任務,故自96年起將原委託案分為「集集堰水資源調配及水門操作管理」及「集集堰資訊及儀控系統檢測維修」2案,採年度方式執行迄今。
英文摘要
The Jiji joint water diversion project has been in operation since 91. It has built information and instrumentation system facilities, covering a lot of information and instrumentation equipment. The overall maintenance operation of the barrage weir is mainly responsible for testing system equipment and maintenance work. The host of the maintenance operation will supervise the quality of the project, and the host and contact person of the collaborative project will be sent to the site to assist in the communication and coordination of the two parties, the management and dispatch of the rotating manpower, and the related issues of the engineering or warranty manufacturers. Matters. Two resident information engineers are responsible for host management, user password maintenance management, regular monitoring of web page information, water drainage and drainage alarm system function verification, equipment failure repair, auxiliary system inspection and repair, system execution management, Spare management, virus software management, etc. Three maintenance point engineers are responsible for the work of a total of 12 major system external point maintenance operations and equipment abnormal repair, and propose equipment improvement suggestions to reduce the frequency of equipment failure.From January to December of this year, the Jiji Management Center and Changhua and Yunlin Control Centers are responsible for the information security part. They are responsible for irregularly cooperating with the government’s information security rules and implement strict control. There is no infiltration event of information security management during the maintenance period. occur. The current status of the 12 major system parts is from January to December this year. A total of 164 incidents were detected and repaired abnormally. Maintenance companies received notifications to deal with them one after another. There is still one unfinished. Warranty repairs will not affect system operation.In the past years, the inspection and maintenance results have been handled. In the past five years (January to December), the number of abnormal information instrumentation control systems was 187 in 104, 150 in 105, 151 in 106, 129 in 107, There were 164 cases in 108. This year, there has been a significant increase. This is mainly due to the instability of the old management and management system and the susceptibility to interference in the radio communication of the release alarm system. At present, the management and management system has been handled for improvement, such as the end of this year. The contract can be implemented as scheduled, and the improvement is expected to be completed by the end of next year, which will allow the system to operate stably, reduce the system failure rate one by one, and achieve the goal of facility maintenance.From January to December this year, the emergency response team was established 7 times in cooperation with the central management center. The total support staff was 257 hours. The number of abnormal events during the emergency response support was 0. The technicians were in the central control center during and after the emergency response. If there is an abnormal condition on standby, the maintenance work will be carried out with full force.During the maintenance operation, every abnormal event that occurs is maintained by professional technicians of the maintenance manufacturer. Whenever a fault occurs, the problem is processed immediately and the problem is tracked. The maintenance manufacturer has been statistically evaluated for many years of data, and continuously adjusted for major system defects. Regular maintenance operations (preventive maintenance) and various system improvement issues (such as major improvements proposed over the years, Jiji weir gate operating system updates and improvements, runoff measurement and forecast system improvements, CCTV monitoring system improvement measures, system lightning protection measures upgrades, water sources (Using the gradual replacement of old equipment, streamlined alarm system update and improvement, equipment streamlined virtualization improvement, gate operating system improvement, etc.) to promote the stability of each system and reduce the failure rate, and establish complete spare parts based on the frequency of failure Inventory, maintenance personnel can repair the equipment in the shortest time when the abnormality occurs, so that the system resumes normal operation and maintains the normal operation of the Jiji barrage. The hydrological system provides effective information to facilitate the turbid water. Stream water is effectively used.With regard to the existing information instrumentation system equipment and the improvement of the surrounding environment, improvements have been continuously proposed in recent years. The effectiveness can be seen from the data over the years. The system stability can be seen after the Jiji barrage gate operating system is updated and improved. The improvement of the system will also reduce the system failure rate. In the future, the system improvement project will focus on the problem of network structure and system integration management of the barrage operation equipment. System improvement plan design and construction supervision and commissioning service case ", the maintenance team will cooperate with the commissioned manufacturer to make recommendations on the current status and improvement of the system, so that the system is more in line with the current situation. The public viewing has been completed, and the contract can be successfully issued, which will allow the overall operating benefits of Jiji River Weir to achieve the expected results.
- 作者 /精誠科技整合股份有限公司
- 出版項 /台中市:經濟部水利署中區水資源局 ,109.02
- 版本項 /初版
- 分類號 /443.64151
點選次數:141
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD006043 | 圖書室B1(中辦) | 202002 | 在館 | 水利署總館 | ||
AD006045 | 圖書室B1(中辦) | 202002 | 在館 | 水利署總館 | ||
TC007885 | 中水局經管課 | 202002 | 在館 | 中區水資源分署 | ||
TC007886 | 中水局經管課 | 202002 | 在館 | 中區水資源分署 |
loading.....
我要預借
108年度集集攔河堰營運管理-營管系統檢測維護委託服務工作成果總報告2019 Summary Report of Inspection and Maintenance of Management system of JiJi Weir Operation Management
AD006043
保留日期至2025-04-28
108年度集集攔河堰營運管理-營管系統檢測維護委託服務工作成果總報告2019 Summary Report of Inspection and Maintenance of Management system of JiJi Weir Operation Management
AD006045
保留日期至2025-04-28
108年度集集攔河堰營運管理-營管系統檢測維護委託服務工作成果總報告2019 Summary Report of Inspection and Maintenance of Management system of JiJi Weir Operation Management
TC007885
保留日期至2025-04-28
108年度集集攔河堰營運管理-營管系統檢測維護委託服務工作成果總報告2019 Summary Report of Inspection and Maintenance of Management system of JiJi Weir Operation Management
TC007886
保留日期至2025-04-28
依河川
依水庫