
非書媒體
編號(GPN/EBN):10107A0048
委辦計畫編號:MOEAWRA1070215
中央管河川疏濬工程專案風險分析研究(光碟版)The Study on Risk Analysis of Dredging Projects for Rivers Managed by Central Government
定價:NT$900
中文摘要
本計畫為改善相關疏濬工程專案風險管理議題,藉由整理過去疏濬工程專案相關資料作為風險分析基礎,辨識各類風險因子諸如疏濬河段、疏濬土砂材質等,剖析疏濬專案的工期與成本變量的各別風險機率分布,並進一步發展出影響疏濬工程專案之工期與成本預測模式,以協助疏濬工程之管理單位因應疏濬工程中主要的不確定性因素。本研究成果可提供河川局同仁未來疏濬工程專案風險掌控及決策之參考。
英文摘要
Taiwan, where is narrow and contains too many people. Furthermore, Taiwan's topography is steep, rivers are short and rushing with upstream erosion, and downstream accumulation is strong. In order to maintain river stability and human safety, we need to manage project carefully and thoroughly. Due to communicate with stakeholders and conduct migration within a different scale dredging project is a tremendous amount of work.
Water Resources Agency has contributed to predominate the implementation status and effectiveness of various engineering projects, and has taken measures to continuously solve various problems. Via the project “Enhance dredging efficiency by using project management tool with A.I Engine”, it was found that dredging projects were subject to the scale of the project team, engineering, schedule, types of bidding, methods of contracting factors etc.
Therefore, in the dredging projects’ implementations, each river bureaus face some situations such as the contracted manufacturers’ complicated background, the unpredictable risks associated with the impact of the stakeholders, and the delays caused by the manufacturers’ violations. Due to the geographical environment, river characteristics, market and other factors, each river office have to adapt to local conditions and have different issues and risks, which leads to the uncertainty within a dredging project implementation. Moreover, lacking immediate and effective information for judgment and decision-making, and the dredging information is not systematically organized, so the analysis mode is needed as the basis for dredging management.
The intention of the project is to increase risk management knowledge energy and minimize the losses impact of the risk. First, by assessing and identifying risks, we will screen out high-risk events and stakeholders with the improvements to reduce the risks which may occur during the dredging project. Then, the qualitative and quantitative risk analysis model was established by sorting out the dredging basis data from the past. Dredging project team must face some decisions are required to make, such as dredging location selecting, the type of dredging, scope, and proportion of sand and gravel. Depend on the risk probability distribution of the dredging engineering period and cost variables, the dredging risk response mechanism and decision support information are constructed to strengthen the dredging risk management energy.
- 作者 /元嵩管理顧問股份有限公司
- 出版項 /台中市:經濟部水利署台中辦公區 ,107.12
- 版本項 /初版
- 分類號 /443.6897
點選次數:145
HyRead電子書閱讀次數:0
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD005642 | 圖書室B1(中辦) | 201812 | 在館 | 水利署總館 | ||
ED000546 | 北水局圖書室 | 201812 | 在館 | 北區水資源分署 | ||
FD006693 | 本所圖書室(本所B棟地下1樓圖書室) | 201812 | 在館 | 水利規劃分署 | ||
FD006694 | 本所圖書室(本所B棟地下1樓圖書室) | 201812 | 在館 | 水利規劃分署 |
loading.....
我要預借
中央管河川疏濬工程專案風險分析研究(光碟版)The Study on Risk Analysis of Dredging Projects for Rivers Managed by Central Government
AD005642
保留日期至2025-04-29
中央管河川疏濬工程專案風險分析研究(光碟版)The Study on Risk Analysis of Dredging Projects for Rivers Managed by Central Government
ED000546
保留日期至2025-04-29
中央管河川疏濬工程專案風險分析研究(光碟版)The Study on Risk Analysis of Dredging Projects for Rivers Managed by Central Government
FD006693
保留日期至2025-04-29
中央管河川疏濬工程專案風險分析研究(光碟版)The Study on Risk Analysis of Dredging Projects for Rivers Managed by Central Government
FD006694
保留日期至2025-04-29
依河川
依水庫