
技術文件
編號(GPN/EBN):10106F0038
委辦計畫編號:MOEAWRA1060137
淹水預警功能之測試與運作(1/2)=Operational Testing of Flood Early Warning System(1/2)
定價:NT$800
中文摘要
發展二維即時淹水預警模式,以提供颱洪應變期間情資研判與防救災決策支援之參考。
英文摘要
To improve national disaster prevention ability, this project cooperates with the Water Resource Agency to develop 2D Potential Inundation Maps. The plan uses the integration advantage in FEWS_Taiwan, connects each counties’ and cities’ 2D Inundation Model of SOBEK, and tracks the Central Weather Bureau’s precipitation data through the standard SOP and FEWS_Taiwan planning and scheduling, to reach the goal of demonstrating real-time simulation of a 2D Inundation model on a regular basis, and performs a test of flooding warning.
The current Water Resource Agency flood warning system is based on simulation of a 1D Inundation model with emphasis on river level forecasting. However, in reality, the flooded area normally happens on regional drainage systems. Therefore, using 2D Potential Inundation Maps to predict possible flooding areas is more in line with the goal of predicting flooding and issuing warnings. But the Potential Inundation Maps are a result of situational simulation, and do not consider temporal and spatial precipitation changes. So, we suggest by connecting in-time precipitation data and a 2D Inundation Model of SOBEK through FEWS_Taiwan, we can run real-time simulations and visualize the possible flooding areas.
In order to verify the correctness of the 2D Inundation Model of SOBEK, this project will also install instant flood water level sensors in potential flood areas. The water level data can be sent back through internet technology to compare with the simulation results. This will be helpful for both future verification and flooding records.
The flood warning system mentioned above has to operate normally and finish calculating within one hour during a typhoon, so the allocation of computer and internet resources is very important. The Warning system cannot be interrupted, which means a backup system has to be set up to keep the warning system functional during typhoons. This project is going to simulate the resources and allocations that keep the system operating normally during a typhoon through connecting two counties’and cities’ 2D Inundation Model of SOBEK. The result will be the reference for the future connection of twenty-two counties and cities 2D Inundation Model of SOBEK.
- 作者 /國立臺北科技大學
- 出版項 /台中市:經濟部水利署水利規劃試驗所 ,106.12
- 版本項 /初版
- 分類號 /443
點選次數:140
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AC012751 | 圖書室B1(中辦) | 201712 | 在館 | 水利署總館 | ||
FC033557 | 本所圖書室(本所B棟地下1樓圖書室) | 201712 | 在館 | 水利規劃分署 | ||
FC033558 | 本所圖書室(本所B棟地下1樓圖書室) | 201712 | 在館 | 水利規劃分署 | ||
FC033559 | 本所圖書室(本所B棟地下1樓圖書室) | 201712 | 在館 | 水利規劃分署 |
loading.....
我要預借
淹水預警功能之測試與運作(1/2)=Operational Testing of Flood Early Warning System(1/2)
淹水預警功能之測試與運作(1/2)=Operational Testing of Flood Early Warning System(1/2)
淹水預警功能之測試與運作(1/2)=Operational Testing of Flood Early Warning System(1/2)
淹水預警功能之測試與運作(1/2)=Operational Testing of Flood Early Warning System(1/2)
依河川
依水庫