技術文件
編號(GPN/EBN):10104P0005
委辦計畫編號:MOEAWRA1040372
105年度三河局轄區洪水預警及防汛整合作業Flood Early Warning and Flood Control Integration Project under the Jurisdiction of the Third River Management Office in 2016
定價:NT$1200
中文摘要
水利署業於民國97年建立烏溪流域洪水預報系統,民國98年建立大甲溪流域洪水預報系統,可於颱風時期自動化啟動,進行即時資料蒐集,颱風定量降雨趨勢預報,集水區逕流、河川變量流模擬,並透過圖形及表格進行展示。
由於近年烏溪與大甲溪流域多處河段進行整治工程,河川斷面等地文資料逐年變更,為能使洪水預報系統後續應用符合流域實際狀況,並依本局颱洪期間使用狀況做必要之功能擴充,洪水預報系統需要配合最新之量測資料進行更新與維護,並建置符合本局所需之預報功能模組,以增加系統維護與操作之效率,提昇洪水預報之品質。本局遂於民國99年接續辦理烏溪、大甲溪流域洪水預報系統之擴充及維護,民國100年將大安溪流域洪水預報系統之建置納入計畫執行,於民國101年辦理轄內洪水預報系統平台整合及維護更新,並於民國102年及103年皆辦理洪水預警及防汛整合作業,提供本局颱洪期間之及時資訊應用。
惟為因應本局轄區流域每年地文資料之持續調查更新,使該系統預警功能品質持續提升,並整併本局防汛作業,使防汛執勤人員能利用系統更快速精確的辦理防汛相關事項,並因應決策者所需各種資訊及模擬情境,須提供決策支援相關資訊,爰辦理預警系統之後續維護更新及防汛整合作業。
英文摘要
As the heavy precipitation event become frequently in recent years, authorities need to do analysis and decision making during typhoon seasons with stable and reliable flood early warning system as well as water information analysis and forecasting data integration, to improving flood control process and implementing emergency measures.
The 3rd River Management Office (WRA03) transferred the Distributed Runoff And Inundation Nowcast System (DRAINS) of the Wu River and Dajia River in 2010, and built the Daan River DRAINS in 2011. DRAINS is able to start automatically during typhoon period, performing real time data collection, typhoon QPESUMS forecasting, watershed runoff and river unsteady flow simulation, and displays the results via images and tables. This helps the authorities to keep up with the water information, analyze the water level errors of previous forecasts and learn the possible flood hazard area via map-style display to brief the water information.
In this year, the basic data for the models are updated and maintained. The flood control map is updated, the new cross-sections and the water gauge information are imported, flood prevention focal point maps are extended, and several useful functions are added, like CCTV image connection, flood warning information bulletin platform, user lights limit management platform, map basis data table viewer, river cross-section information viewer, water level and discharge forecasting display web page, and history inundation area data display function enhancement. The water information from local government are interfaced, work with all CCTV image data, displayed by an integrated display platform.
A decision support system are implemented to perform scenario simulation with flexible water information adjusting according to the current Daan River cross-section condition, supporting the flood control process and decision making in typhoon station duty.
The CWB rainfall forecasting products, ETQPF, ETQPF_REF1, ETQPF_REF2, are applied to DRAINS, and a semi-automatic reply system is developed to satisfy the demand requests by WRA in typhoon period.
During typhoon season, typhoon information, support on system operation and techniques are provided while WRA03 is in 2nd level openness. In the Chan-hom, Soudelor, and Dujuan typhoon this year, personnel are stationed for supporting.
This project improves DRAINS more realistic to the actual catchment conditions; accuracy is preserved, and extends related functions according to the demands on usage. In addition, flood control and survey work assistance are provided, making the flood warning and operation integration services improved and more efficient.
- 作者 /多采工程顧問有限公司
- 出版項 / 經濟部水利署第三河川局 ,105.12
- 版本項 /初版
- 分類號 /443.6
點選次數:144
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
HC002806 | 圖書室 | 201612 | 在館 | 第五河川分署 |
loading.....
我要預借
105年度三河局轄區洪水預警及防汛整合作業Flood Early Warning and Flood Control Integration Project under the Jurisdiction of the Third River Management Office in 2016
HC002806
保留日期至2025-04-27
依河川
依水庫