
非書媒體
編號(GPN/EBN):1010402527
委辦計畫編號:MOEAWRA1040195
花蓮溪水系河防構造物補充調查--光碟版=The Hualien River flood control structures supplementary investigation
定價:NT$1000
中文摘要
本計畫辦理花蓮溪水系防洪構造物測量及調查、數值地形圖修測及水閘門測量及調查等工作。
英文摘要
The construction of embedding piles in cross-section at Hualien River system was completed in 1978 with regard to the cross-section measuring results report where completed over the years in 1993, 2004, 2005, 2008 and 2011. The Council conducted "Hualien River Management Planning Review" and the preliminary results of the project range area includes of Hualien main river stream Mugua River, Shoufeng River, Wanli River, Maan River, Guangfu River and the other 10 tributary streams. On instructions from the Ministry of Economy and approved by the provincial government announcement for Hualien river system management basic plan in 1991. The Hualien river system management planning report has been completed in 1989. The river flood controlling structures is gradually completed since many years which related to the topographic map data and embankment structures data yet to clarify and supplement.
In order to meet the requirement of "Hualien River Management Planning (Amendment)”, the council executed measurement survey at embankment revetment, drain gate and water intake gate to update 1/1000 scale map to create new river map information in accordance with follow up the river management planning and engineering facilities.
The surveillance area contained of confluence from Hualien River 1 mainstream and 10 tributary streams have completed total 174km of measurement survey at embankment revetment (Table 2-16), 32 gates of water gate surveillance (Table 2-17~18) and up to down streams of Hualien bridge total 233 hectare of topographic map revision (West up stream bank of the left embankment of the sugar factory at Hualien river, right bank embankment farm and east of detention of illegalize sand area about 106 hectare, right bank embankment index number 1 of Guangfu River and east of detention of illegalize sand area about 20 hectare, both sides of south Chingshui river detention of illegalize sand area about 37 hectare and up to down main stream of Hualien bridge area about 70 hectare). In addition, this plan integrates with past year’s aerial photographs, river water system, cadastral information, cross-section map of embankment results, coordinate with Google Earth Enterprise with procured Water Resources Agency to build 3D GIS showcase to show interactive information systems.
- 作者 /群立科技股份有限公司
- 出版項 /花蓮市:經濟部水利署第九河川局 ,104.11
- ISBN /9789860468472 ; 9789860468
- 版本項 /初版
- 分類號 /443.6
點選次數:154
PDF下載次數:4
HyRead電子書閱讀次數:1
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD004991 | 圖書室B1(中辦) | 201511 | 在館 | 水利署總館 | ||
FD005193 | 本所圖書室(本所B棟地下1樓圖書室) | 201511 | 在館 | 水利規劃分署 |
loading.....
我要預借
花蓮溪水系河防構造物補充調查--光碟版=The Hualien River flood control structures supplementary investigation
AD004991
保留日期至2025-04-28
花蓮溪水系河防構造物補充調查--光碟版=The Hualien River flood control structures supplementary investigation
FD005193
保留日期至2025-04-28
依河川
依水庫