鹽港溪大斷面測量The achievement report of a cross-section survey for the Yan-Gang-Si Drainage
定價:NT$1000
中文摘要
鹽港溪大斷面測量
英文摘要
Channel measurement for the governance and management of the necessary work, including large cross section measurement is necessary to handle projects on a regular basis, to facilitate the management units understand channel water capacity, changes in the elevation of existing dikes and channels, and so on, for " The achievement report of a cross-section survey for the Yan-Gang-Si Drainage " program, in this case work completed during the implementation of the scheme are as follows:
1.the measuring section : measurement job aspects amounted to (1) detection known plane points 5 points, and (2) detection known elevation points 5 points, and (3) measurement section pile 284 points and the aerial standard 15 points, and (4) completed 142 at section measurement and the structure real survey job (revetment type State, and across Canal structure real, and flood control structure real and the into workers, survey), and (5) completed color aviation photography measurement (numerical are shot image figure, and 1/1,000 numerical topographic maps, and DEM results), and (6) completed drainage map identificatications finishing meter 38 site, and (7) Complete salt Canal Creek drainage in Yan-Gang-Si current status land use mapping, and (8) the collection of 8 photos map and channel number, and (9)Photomesh 3D model construction, and (10) interactive 3D GIS build operations.
2.analysis of river morphology image interpretation : Orthophoto of the planning region in line with the value of production, and on aerial photo interpretation techniques to handle image interpretation, and analyze water, River Plate texture, drainage patterns, stream habitat and cross drainage structures, clear of ecosystems and environmental factors, as a future reference to create diverse habitats.
3.analysis of bed material sampling: 10 bed load survey meter, accordingto the results of sample analysis estimates the manning roughness coefficient n values in the range of 0.013~0.018.
4.water analysis: Water capacity hydraulic routing mode used HEC-RAS model for review, manning roughness coefficient n-value mining 0.025~0.035. Other exports because it is in the sea, tide starting water level recovery in July-October the mean high tide level EL.2.3 meter run.
5.the existing structure safety review :
(1)Bank top security review and flood control structures: At present Salt Creek drainage of the existing flood control structures include include left and right bank 9,385 meters. By water acting calculus results known, South XING Qiao for territories, South XING Qiao to downstream at only has sporadic of water high insufficient, to upstream at by section 32 to country 1 highway bridge section 44 Qian, more to upstream more has water high and the di high insufficient of trend, which section 41 to section 43 are has di high insufficient of case, remaining are can meet their river protection standard.
(2)safety review cross-channel structure: Investigation of the case and cross-channel structure of a total of 19 bridges, the Insufficient span is Chung-Hsing bridge, Ming-Der bridges and Hsing-Fung bridge, Nan-hsing bridges, I- Fung bridges and Hsing-Fung bridge height less than at the end of it.
6.analysis on channel scouring and silting variation change:
(1)the profile comparison: Than on 94 and 104 section survey results Riverbed changes, section 00~ section 02, section 02-2~ section 06, section 16-1~ section 16-2 and section 46-2~ section 46-3 deposition phenomena, most of the remaining sections are flush. Among them, Nan-hsing bridges upstream sections were scour phenomenon ispartly due to engineering applied, not natural erosion.
(2)sand changes : lose sand mining NETSTARS analysis in the present case, NETSTARS losing sand for quasi two dimensional models with different return periods from the peak flow, simulation analysis of the Salt Creek drainage of sand lost in Yan-Gang-Si Drainage.
(3)bridge local scour depth : bridge local scour, contraction scour the beam depth and general scour the sum total scour depth is the depth of each of the three bridges, the achievements show the total amount of each bridge scour depth between 3.89m (railway bridge) ~ 5.65m (highway bridge) .
(4)Channel Change Analysis : 91 years, 99 years, 101 years and 103 years of the number of flow paths to be drawn into a transition diagram, the results show significantly exceeded 91 years in many revetment and 99 years in Shing-Chen bridge upstream revetment slightly beyond, the rest of the year the flow path.
- 作者 /自強工程顧問有限公司
- 出版項 /新竹市:經濟部水利署第二河川局 ,104.12
- ISBN /9789860474909 ; 9789860474
- 版本項 /初版
- 分類號 /443.6
點選次數:126
PDF下載次數:7
HyRead電子書閱讀次數:1
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AC011911 | 圖書室B1(中辦) | 201512 | 在館 | 水利署總館 | ||
FC032011 | 本所圖書室(本所B棟地下1樓圖書室) | 201512 | 在館 | 水利規劃分署 |
loading.....
我要預借
鹽港溪大斷面測量The achievement report of a cross-section survey for the Yan-Gang-Si Drainage
AC011911
保留日期至2025-04-28
鹽港溪大斷面測量The achievement report of a cross-section survey for the Yan-Gang-Si Drainage
FC032011
保留日期至2025-04-28
依河川
依水庫