地下水補注機制水力特性調查分析-濁水溪沖積扇(2/2)-光碟版 Investigation of hydraulic characteristics for groundwater recharge mechanism-Acase study on alluvial fan of Cho-Shui River (2/2)
定價:NT$400
中文摘要
依98年度辦理之「地下水補注機制水力特性調查分析先驅研究」計畫初步成果,水井水力斷層掃描已完成現地小尺度井場試驗並利用水力斷層掃描概念完成水力參數異質性分析,驗證水力斷層掃描理論應用於現地抽水試驗之可行性;此外河川水力掃描亦於先期研究中,完成初步河川水位與地下水位相關性分析,並初步驗證河川水力掃描應用於中尺度水力斷層掃描之可行性。然此二項研究工作於應用於現有地下水觀測網,亦即流域或沖積扇尺度之水力參數異質性分析之可行性,仍待充份確認,故本計畫擬以沖積扇尺度範圍為研究對象,以前開二項先進分析技術結合現行地下水觀測網水位觀測資訊,檢定異質性水力參數特性。
英文摘要
Abstract
Controlling of aquifer hydraulic parameters is the main factor influencing the future groundwater resources management and recharge evaluation. However, the hydraulic parameters can only be obtained from few wells which have been implemented water tests or from models calibration, existing hydraulic parameters were used to acquire parameters of other areas by kriging method. There are several differences between hydraulic parameters obtained from the method stated above and from in-situ tests. In order to improve the accuracy of hydraulic parameters, the project cited advanced hydraulic tomography and river stage tomography technologies from foreign counties and operated in coordination with the monitoring function of present groundwater observed wells network to apply to Chou-shui river alluvial fan. In order to improve the accuracy of hydraulic characteristics estimation, and plan future development of hydraulic tomography and river stage tomography technologies, the project estimated data by hydraulic tomography and river stage tomography using numerical simulation methods which considering the hydraulic parameters obtained from the large-scale pumping tests, determining observation wells which had high correlation among groundwater levels, and considering correlation between river water level and groundwater level changes.
The results of the project are: (1) hydraulic conductivity of aquifer one to four estimated by hydraulic tomography using artificial pumping behaviors are the same with the actual situation, therefore, using current artificial pumping behaviors to estimate hydraulic conductivity of a large-scale aquifer is feasible, (2) according to the results of correlation analysis between river stage and groundwater level, correlation coefficient distribution are similar in upstream, middle stream and downstream of Chou-shui river, and there are high correlation between river stage and groundwater level in southeast and northwest alluvial fan of Chou-shui river, (3) the influence of Chou-shui river and Beigang river on the groundwater level of this area are the similar, (4) according to the results of groundwater recharges potential, high potential recharge regions are along the Chou-shui river, (5) average yearly recharge depth of Tu-ku bridge watershed and Beigang(2) watershed are 87.4cm and 65.06cm respectively, (6) leakage of soil layers is decreasing in Chou-shui river alluvial fan from upstream to downstream.
Keyword: hydraulic tomography, river stage tomography, correlation analysis, groundwater
- 作者 /國立雲林科技大學
- 出版項 /台北市:經濟部水利署(台北辦公區) ,100.12
- ISBN /9789860305371 ; 9789860305
- 版本項 /初版
- 分類號 /443.86
點選次數:218
PDF下載次數:13
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD003690 | 圖書室B1(中辦) | 201112 | 在館 | 水利署總館 | ||
BD004565 | 圖書室B1(北辦) | 201112 | 在館 | 水利署總館 | ||
FD003146 | 本所圖書室(本所B棟地下1樓圖書室) | 201112 | 在館 | 水利規劃分署 |
loading.....
我要預借
地下水補注機制水力特性調查分析-濁水溪沖積扇(2/2)-光碟版 Investigation of hydraulic characteristics for groundwater recharge mechanism-Acase study on alluvial fan of Cho-Shui River (2/2)
AD003690
保留日期至2025-04-28
地下水補注機制水力特性調查分析-濁水溪沖積扇(2/2)-光碟版 Investigation of hydraulic characteristics for groundwater recharge mechanism-Acase study on alluvial fan of Cho-Shui River (2/2)
BD004565
保留日期至2025-04-28
地下水補注機制水力特性調查分析-濁水溪沖積扇(2/2)-光碟版 Investigation of hydraulic characteristics for groundwater recharge mechanism-Acase study on alluvial fan of Cho-Shui River (2/2)
FD003146
保留日期至2025-04-28
依河川
依水庫