頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
定價:NT$500
中文摘要
本報告為隆恩堰現址補強工程之竣工報告,內容包含主要施工項目及數量、施工佈置、施工經過及進度,並針對品質管制與環境保護及安全衛生之事項進行說明。
英文摘要
Lung-En Weir is the important source for Hsin-Chu Area. Some parts of weir were damaged by Aere Typhoon in 2004 and repaired in 2006. However, the weir constructions had different design criterion between the past and repaired constructions, and the piers of railroad, high speed railroad, express road are going to be constructed near the weir. They will induce the complex hydraulic condition in the weir vicinity that increase the risk of damage once again. So WRANB executes “ The Strengthen Engineering of Lung-En Weir Project ”for steady water supply.
This report is As-Build Report about “The Strengthen Engineering of Lung-En Weir Project ”, including major construction items and quantity, construction layout, progress of the construction process. Finally, we also describe for the quality control , environmental protection and industrial safety during construction.
- 作者 /中興工程顧問公司
- 出版項 /桃園縣龍潭鄉:經濟部水利署北區水資源局 ,099.12
- ISBN /9789860268737 ; 9789860268
- 版本項 /第一版
- 分類號 /443.6897
點選次數:120
PDF下載次數:7
館藏資訊
暫存書單 | 登錄號 | 館藏地 | 年代號 | 狀態 | 借閱到期日 | 分館 |
---|---|---|---|---|---|---|
AD003337 | 圖書室B1(中辦) | 201012 | 在館 | 水利署總館 | ||
BD004273 | 圖書室B1(北辦) | 201012 | 在館 | 水利署總館 | ||
DD000375 | 規劃課圖書室 | 201012 | 在館 | 第四河川分署 | ||
ED000267 | 北水局圖書室 | 201012 | 在館 | 北區水資源分署 | ||
FD002832 | 本所圖書室(本所B棟地下1樓圖書室) | 201012 | 在館 | 水利規劃分署 | ||
ID000496 | 圖書館 | 201012 | 在館 | 第七河川分署 | ||
KD000240 | 圖書室 | 201012 | 在館 | 臺北水源特定區管理分署 | ||
MD000441 | 圖書舘 | 201012 | 在館 | 南區水資源分署 | ||
RD000036 | 圖書室 | 201012 | 在館 | 第八河川分署 |
loading.....
我要預借
頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
AD003337
保留日期至2025-04-29
頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
BD004273
保留日期至2025-04-29
頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
DD000375
保留日期至2025-04-29
頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
ED000267
保留日期至2025-04-29
頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
FD002832
保留日期至2025-04-29
頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
ID000496
保留日期至2025-04-29
頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
KD000240
保留日期至2025-04-29
頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
MD000441
保留日期至2025-04-29
頭前溪隆恩堰現址補強工程竣工報告〈光碟版〉 The As-Build Report for the Strengthen Engineering of Lung-En Weir, Touchien River
RD000036
保留日期至2025-04-29
依河川
依水庫